Currently, I think the deliverable selection plan is to standardized to the point where it is not applicable to all engagements. There needs to be an option to build out on your own instead of picking from the pre-determined list as this then requires more time of the individual to go through and remove the items they do not need, when building out from a high-level outline might be the easier and quicker route to take.